Altering and adapting existing spaces to ensure they meet a client's specification requires extensive knowledge and understanding of the existing structure. Our duty of care, coupled with respect for a building, shapes our approach to each project. From the outset, our specialist teams review the proposed works and where necessary, adapt procedures to ensure the project is a success.

Our vast experience within occupied buildings, in parallel with our flexible and 'can do' approach, has gained us an enviable proven track record as being a specialist contractor within this sector.

Close
Projects:

ANDREWS BOAT HOUSE

  • ANDREWS BOAT HOUSE
  • ANDREWS BOAT HOUSE
  • ANDREWS BOAT HOUSE
Client: Eton College
Project: Refurbishment of Boat House
Duration: 16 weeks

Show Details

Internal strip-out of the existing boat house (a grade 2 listed building) and the construction of a new internal insulated structure within the existing building envelope. This provided a new open-plan training floor, shower rooms, offices and WCs, incorporating a sports flooring system together with external wall and ceiling thermal cladding.

Close

Emmott House

  • Emmott House
Client: Reigate Quaker Housing Association
Project: Conversion and Refurbishment
Duration: 24 weeks

Show Details

This project was split into two phases, allowing a number of residents to remain within the building throughout the project. Key works included complete internal strip-out of the 24no. bedsits, extensive structural alterations and adaptions to provide 16no. 1-bed units, complete with bathroom, lounge and kitchen, installation of a new internal lift and extensive electrical works, installing new fire alarms and nurse call systems.

Close

Ashford School

  • Ashford School
  • Ashford School
  • Ashford School
Client: London Diocesan Board for Schools (LDBS)
Project: Entrance Alterations and Extension
Duration: 12 weeks

Show Details

Relocating and establishing a temporary main entrance and reception / admininstration offices, internal demolition and alterations to provide a new lobby, reception, administration offices, sick bay, disabled WC and new staff room.

Close

Dorney Lake - 2012 Olympic Rowing Venue

  • Dorney Lake
  • Dorney Lake
  • Dorney Lake
  • Dorney Lake
  • Dorney Lake
  • Dorney Lake
  • Dorney Lake
  • Dorney Lake
  • Dorney Lake
  • Dorney Lake
  • Dorney Lake
Client: Eton College
Project: External Refurbishment Works
Duration: 6 weeks

Show Details

Erecting external fixed and mobile access platforms, removal of existing cladding and the manufacture and installation of new oak cladding, roof repairs, external balcony surfacing and general re-decoration.

Close

St Dunstans RC Primary School

  • St Dunstans RC Primary School
  • St Dunstans RC Primary School
  • St Dunstans RC Primary School
  • St Dunstans RC Primary School
Client: St Dunstan RC school
Project: Alterations and Refurbishment
Duration: 50 weeks

Show Details

Works entailed a multi site project (6.No in total) constructing a 2-storey classroom extension, two seperate single-storey extensions providing new WC's and music rooms and a new main school reception; internal refurbishment to provide new admin offices, staff room, at various locations around the school, spread into four phases.

Close

Construction

From new stand-alone buildings, extensions or basements to adding additional floors on existing structures, we have the experience and capacity to undertake your project.

Depending on timescales, budgets or specific requirements, we can deliver various types of buildings which include the use of either traditional or modern methods of construction. We actively promote sustainable 'buildings for the future' where our knowledge and enthusiasm for new construction methods and techniques are promoted, such as the use of Structural Insulated Panels (SIPs).

Close
Projects:

Ripley School

  • Ripley School
  • Ripley School
  • Ripley School
  • Ripley School
Client: Ripley CofE School
Project: New extension
Duration: 22 weeks

Show Details

Construction of a new single-storey extension, providing a new main entrance and school reception, new school kitchen and an Early Years play nursery facility.

Close

Buckingham School

  • Buckingham School
  • Buckingham School
  • Buckingham School
  • Buckingham School
  • Buckingham School
Client: London Borough of Richmond upon Thames
Project: Buckingham School
Duration: 20 weeks

Show Details

Design & Build procured project which involved the removal of an existing modular single-storey building, construction of a new stand-alone building providing a sports hall, kitchen, WCs, meeting room and offices. Using a SIPS structure which combined with underfloor heating and an external air source heat pump met the low U-value design parameters.

Close

Clarendon Gateway Project

  • Clarendon Gateway
  • Clarendon Gateway
  • Clarendon Gateway
  • Clarendon Gateway
  • Clarendon Gateway
Client: London Borough of Richmond upon Thames
Project: Gateway @ Twickenham Academy
Duration: 16 weeks

Show Details

Design & Build procured project which involved the construction of a single-storey building providing a new 6th form area for autistic pupils including classrooms, WCs and food preparation / kitchen area. Due to the nature and location of the works within this particular environment, the project required additional and pro-active measures to reduce the impact of the construction activies within a live school environment.

Close

Wallace Fields

  • Wallace Fields
  • Wallace Fields
  • Wallace Fields
  • Wallace Fields
  • Wallace Fields
  • Wallace Fields
Client: Wallace Fields Infant School
Project: Reception & Administration Offices
Duration: 32 weeks

Show Details

Design and Build project to construct a single-storey extension with internal demolition and alterations to the existing layout. This provided a new entrance lobby, reception, reprographics room, staff kitchen, administration offices and formation of a early years group room. Externally a new staff car park, fencing and security gates provided safe segregation for the pupils and visitors to the school.

Close

Maven Vetenary Clinic

  • Maven Vetenary Clinic
  • Maven Vetenary Clinic
  • Maven Vetenary Clinic
  • Maven Vetenary Clinic
Client: Maven Vetenary Clinic
Project: Construction of new rear extension & internal refurbishment of existing areas
Duration: 42 weeks

Show Details

Construction of new single storey extension providing new theatres, prep area, cat & dog ward & internal refurbishment of administration offices, staff breakout areas & existing front of house reception & formation of separate cat & dog waiting areas.

Close

LISTED BUILDINGS &
HERITAGE WORKS

Working with our clients, their design teams, local authorities and listed building inspectors, our experience and workmanship on buildings with historic interest and listed consent allows us to demonstrate our respect and enthusiasm for restoration.

Close
Projects:

Isokon Flats

  • Isokon Flats
  • Isokon Flats
  • Isokon Flats
  • Isokon Flats
Client: Notting Hill Housing Association
Project: Repairs & Redecorations
Duration: 12 weeks

Show Details

Refurbishment of the external façade of the entire Grade 1 listed building. The building is an example of one of the very first styles of social living with London.

Close

Cornerhouse

  • Cornerhouse
  • Cornerhouse
  • Cornerhouse
  • Cornerhouse
Client: Eton College
Project: Internal and External Refurbishment of Cornerhouse
Duration: 20 weeks

Show Details

Internal refurbishment of the ground and 1st floors (whilst 2nd floor remained in occupation) within a listed building, to create three separate apartments. Brickwork repairs on this particular building required the use of a special mortar with washed and exposed aggregates, known as 'Eton pointing'.

Close

Queens Eyott

  • Queens Eyott
  • Queens Eyott
  • Queens Eyott
  • Queens Eyott
  • Queens Eyott
Client: Eton College
Project: Queens Eyot (an island on the river Thames)
Duration: 5 weeks

Show Details

Internal strip-out and alterations to create a new layout, structural repairs to timber frame, new external cladding and redecorations. Due to its mid-river location, all plant, materials and operatives were ferried on a daily basis.

Close

Horton Farm

  • Horton Farm
  • Horton Farm
Client: English Partnerships
Project: Horton Farm
Duration: 12 weeks

Show Details

Roof repairs, replacement of double-glazed sash windows, re-pointing using slate lime mortar and external repairs to a listed building and English Heritage farmhouse along with out buildings & barns.

Close

DEVELOPMENT
& RESIDENTIAL

Our experience within the commercial sector focuses our approach for speculative new-builds and residential projects. Attention to detail is more personal to the end user, therefore our professional manner and approach focuses on achieving client satisfaction.

Close
Projects:

Hill Court

  • Hill Court
  • Hill Court
  • Hill Court
Client: Hill Court - Putney
Project: Roofing & Window Refurbishment Works
Duration: 20 weeks

Show Details

Works entailed asbestos removal, re-roofing, installation of edge protection, installation of new aluminium windows. All properties were occupied during the works, which also included installation of new cold water storage tanks, replacement of lift and installation of communal TV systems.

Close

Elmfield Avenue

  • Elmfield Avenue
  • Elmfield Avenue
Client: Private
Project: Demolition of existing single dwelling and construction of a pair of semi-detached residential homes
Duration: 42 weeks

Show Details

Demolition of existing dwelling, excavations and ground works to construct new basement plus 3 upper floors, providing traditionally-built homes.